Ansin Sports Complex project

Sports + entertainment

Ansin Sports Complex

Miramar, Florida

CBN carried its assigned systems through a disrupted construction process.

CBN installed the structured-cabling infrastructure and audio-visual systems, completed full commissioning, and delivered final turnover.

2Delivered disciplines
1Complete commissioning process
1Final turnover

CBN’s role

Accountability across the assigned technology scope.

Major construction setbacks changed field conditions and required CBN to protect its work while adapting coordination.

CBN did not provide design-build services for this engagement.

Delivered scope

From field execution to completed systems.

01

Structured cabling

Installed pathways, terminations and the backbone supporting the facility’s technology systems.

02

Audio-visual

Installed and integrated the AV package for facility communication and events.

03

Verification

Tested the installed systems and completed the required documentation.

04

Turnover

Carried CBN’s assigned scope through commissioning and final closeout.

The structured-cabling and AV systems reached full commissioning and final turnover.
← Return to all projectsDownload the complete portfolio ↗

Discuss your project

Bring CBN into the project before the systems become separate problems.

Schedule a CBN Property Technology Assessment and build one connected strategy for the entire property.

Request the assessment